HOME
ANTARCTIC TREATY
ENVIRONMENT PROTOCOL
INFORMATION EXCHANGE
TOOLS & RESOURCES
 
  Home > Environment Protocol > EIA > EIA Database
 

EIA Database

 
Type
Year
Party
Topic
Text Search
 
YearPartyTypeTitleActivity  
2019PolandIEEInitial Environmental Evaluation of the tourist activity conducted in the Antarctic Peninsula by the yacht “Chief One”Private tourist cruise with planned landings by the yacht “Chief One”
2019TurkeyIEEINITIAL ENVIRONMENTAL EVALUATION FOR TEMPORARY CAMP ON HORSESHOE ISLAND IN ANTARCTICAThis Initial Environmental Evaluation Report pertains to the proposed activity for installation of three shelter modules, as temporary camp
2018United KingdomCEERothera Wharf Reconstruction and Coastal Stabilisation Draft Comprehensive Environmental EvaluationReplacement of Rothera Wharf and stabilisation of the area around the runway at Rothera Station
2018AustraliaIEEInitial Environmental Evaluation - Year Round Aviation Access Project 2018-19 Field ActivitiesYear Round Aviation Access Project 2018-19 Field Activities
2018BelgiumIEEINITIAL ENVIRONMENTAL EVALUATION FOR ACTIVITIES CARRIED OUT AT THE PRINCESS ELISABETH ANTARCTIC RESEARCH STATION BELARE 2018-2019operation of the Princess Elisabeth Station, construction, science support
2018BrazilIEEEnvironmental Evaluation of the project entitled “PROSPECTION OF CRETACEOUS FOSSILS FROM THE JAMES ROSS SUB-BASIN AND EVOLUTION OF THE VERTEBRATE FAUNA AIMING THE PALEOENVIRONMENTAL RECONSTRUCTION AND BIOGEOGRAPHY OF THE ANTARCTIC PENINSULA (PALEOANTAR)”To investigate the former Antarctic fauna and flora, particularly from the Mesozoic Era.
2018BrazilIEEIEE of the project “Establishment of performance parameters for new Brazilian buildings in Antarctica from the evaluation results of the Antarctic Station Cmte Ferraz/Sustainability and performance of Brazilian buildings in Antarctica.Follow up of the construction phases of the new EACF buildings through photographic record, field records, measurements and interviews with Navy Group
2018BrazilIEEInitial Environmental Evaluation of the project enitled “New autonomous technologies in the invesgation and monitoring of Antarctic Bottom Water transformations (Nautilus)".The launch and collection of autonomous underwater vehicles (seagliders); monitoring of net CO2 flows at the air-sea interface.
2018BrazilIEEInitial Environmental Evaluation of the project enitled “Surviving in the extreme: polar medicine and health anthropology in Antarctica”Carry out biological and cognitive data collection of military volunteers who will remain on the ships and EACF, and researchers volunteers in camps.
2018BrazilIEEInitial Environmental Evaluation of the project entitled "Surface energy balance and its control in the permafrost and active layer of the Fields Peninsula and Maritime Antarctica".Use an UAV to obtain high spatial resolution images at Harmony Point; monitoring system and data collection of the thermal and water dynamic...
        Result Page 1 of 151       Next   Last


 
 
About us | Site map
| | |  
 
 
  Copyright © ATS 2011